Rated Excellent · TripAdvisor
Performer lit by beam lighting and haze on an open-air stage at an evening corporate event
Event production Morocco · Marrakech crew

Staging, lighting and scenography, built by a crew based here.

Production for launches, brand activations, galas and conference plenaries across Morocco — set build, lighting, sound, LED and rigging, delivered by a Marrakech team at net rates for agencies and corporate clients.

Riad to arena build scale<24h costed replyEN FR crew chiefs2012 Marrakech HQ since
How a build works

Built for the venue you actually booked.

A set drawn for a generic ballroom is a set that gets rebuilt on site. We start from the room as it is: the real ceiling height, the real rigging points, the load-in door that is narrower than the plan says, the power that is available rather than the power that is marked. The drawing then matches what can actually be built.

The same applies outdoors. A Palmeraie estate, a medina riad courtyard and an Agafay camp each have a different access problem, a different power problem and a different wind problem. We would rather tell you which one is going to be expensive before you commit to it than after.

  • Site survey before the drawing, not after
  • Wind threshold and wet-weather alternative priced into every outdoor build
  • Freight and customs lead time flagged at quote stage
  • Crew chiefs working in English and French
Stage lighting rig with moving heads and trussing set up for a live event
Rig & trussing · technical buildMorocco
Build scale
Riad courtyard to arena
Disciplines
Set, lighting, sound, LED, rigging
Lead time
3 weeks to 3 months
Crew languages
EN & FR chiefs
Quote
Within 24 hours
Disciplines

What we build and operate

One production team, from the drawing to the de-rig.

01

Scenography and set

Custom fabrication, modular staging, backdrops and dressing built to the surveyed room rather than to a stock plan. Drawings, load calculations and a build schedule before anything is cut.

02

Lighting

Conventional and moving-head rigs, cued to a run of show rather than switched on and left. Programming and operation by the same people who hung it.

03

Sound and AV

Line array through to speech reinforcement, radio mics, comms, playback and recording, with a technical rider matched before contracting rather than argued about on site.

04

LED and video

Indoor and daylight-capable screens, content servers, camera relay and IMAG for large rooms. Pitch and brightness chosen for the actual viewing distance and light level.

05

Rigging and power

Ground support and roof systems, load plots, generator sizing and distribution, with a named wind threshold on every outdoor structure.

06

Entertainment and talent

Gnaoua ensembles, contemporary dance, DJs and international acts, briefed to the run of show and contracted with the rider attached.

07

Permits and logistics

Municipal permissions, freight, customs clearance and site access — the administrative layer that usually decides whether a build lands on time.

08

Crew and de-rig

Production manager, crew chiefs and floor crew for build, show and strike, with the venue returned as it was found.

What's covered

Complete production capability

Every technical discipline a build needs, from one crew.

Scenography & setStaging & riggingLighting designSound & commsLED & videoPower & distributionTalent bookingPermits & freight
Match your format

What kind of build are you producing?

Each format has a different lead time and a different dominant cost. This is roughly how they differ.

2–4 weeks lead

Conference plenary

Staging, lectern, screen and speech reinforcement in a hotel ballroom. Mostly hired inventory, so it moves fast.

4–8 weeks lead

Gala or awards evening

Themed set dressing, table lighting, sound for a band and a run of show cued to the awards sequence.

8–12 weeks lead

Product launch

Custom fabrication, LED and a reveal mechanic. Most of that time is fabrication, not on-site build.

10–16 weeks lead

Outdoor or desert build

Generator power, ground support rigging, dust and wind planning, and freight to a site with no permanent infrastructure.

Why produce in Morocco

Ambitious builds, without European build costs.

Crew, transport and fabrication cost meaningfully less here than in Western Europe, which is usually what makes a scenographic set possible on a budget that would otherwise buy a hired backdrop. The saving is real, but it is not free: specialist kit that has to be freighted in eats part of it, so we are explicit about which half of the build is local and which is imported.

The other argument is the rooms themselves. A Palmeraie estate, a courtyard riad or a camp under the stars gives a production designer something to work with that a conference hotel simply cannot, forty-five minutes from the city.

45 minCity to a desert build site
<4hDirect flights from most European hubs
2012Operating from our own Marrakech office
Questions

What producers ask first

Anything not covered here, ask the ops desk directly on WhatsApp.

Can you source production equipment that isn't available locally?

Yes. Most standard staging, lighting and sound inventory is available in Casablanca or Marrakech. Anything specialist — a particular console, an unusual LED pitch, kinetic rigging — comes in from Europe, which adds freight and customs time. We flag that at quote stage rather than discovering it in build week.

Can you build a stage in a riad courtyard or a desert camp?

Yes, and those are the builds worth doing well. Both have real constraints: a medina riad has no vehicle access, so everything is carried in by hand through the souk, and a desert camp needs generator power, dust management and a wind plan. Both are routine for us; both change the timeline and the budget.

How much lead time does a full production build need?

A straightforward hotel ballroom build wants three to four weeks. A custom scenographic build with a fabricated set, LED and rigging wants eight to twelve, most of which is fabrication rather than on-site work. Short-notice builds are possible but narrow what can be made rather than hired.

What happens to an outdoor production if the weather turns?

Every outdoor build is quoted with a wind threshold and a named wet-weather alternative. Rigging comes down at a defined wind speed — that is a safety decision, not a judgement call on the night — so the alternative venue or cover is contracted in advance, not improvised.

Does your technical crew work in English?

Crew chiefs and production managers work in English and French. Floor crew work in Arabic and French, with the crew chief relaying. If your own technical director is coming, they brief the crew chief and it carries down cleanly.

Do you work alongside an agency's own production team?

Often. Plenty of European agencies bring their own creative and technical direction and need local execution: crew, kit, permits, power, freight and the people who know which supplier actually delivers. We are comfortable being the local half of that and staying invisible.

Trade enquiries

Send the brief. The build comes back costed.

Venue, date, audience size and what the room has to do. A sketch or a reference image is worth more than a paragraph.

  1. Brief and site details received
  2. Site survey, then a costed build with net rates, in 24 hours
  3. Drawings and schedule agreed, then contract
  4. We build, run the show and strike

Request net rates

Trade only. A costed programme back within 24 hours.

Trade enquiries only · Reply within 24h · Your brief stays confidential

§ — Related services

The rest of the MICE cluster