Production for launches, brand activations, galas and conference plenaries across Morocco — set build, lighting, sound, LED and rigging, delivered by a Marrakech team at net rates for agencies and corporate clients.
A set drawn for a generic ballroom is a set that gets rebuilt on site. We start from the room as it is: the real ceiling height, the real rigging points, the load-in door that is narrower than the plan says, the power that is available rather than the power that is marked. The drawing then matches what can actually be built.
The same applies outdoors. A Palmeraie estate, a medina riad courtyard and an Agafay camp each have a different access problem, a different power problem and a different wind problem. We would rather tell you which one is going to be expensive before you commit to it than after.
One production team, from the drawing to the de-rig.
Custom fabrication, modular staging, backdrops and dressing built to the surveyed room rather than to a stock plan. Drawings, load calculations and a build schedule before anything is cut.
Conventional and moving-head rigs, cued to a run of show rather than switched on and left. Programming and operation by the same people who hung it.
Line array through to speech reinforcement, radio mics, comms, playback and recording, with a technical rider matched before contracting rather than argued about on site.
Indoor and daylight-capable screens, content servers, camera relay and IMAG for large rooms. Pitch and brightness chosen for the actual viewing distance and light level.
Ground support and roof systems, load plots, generator sizing and distribution, with a named wind threshold on every outdoor structure.
Gnaoua ensembles, contemporary dance, DJs and international acts, briefed to the run of show and contracted with the rider attached.
Municipal permissions, freight, customs clearance and site access — the administrative layer that usually decides whether a build lands on time.
Production manager, crew chiefs and floor crew for build, show and strike, with the venue returned as it was found.
Every technical discipline a build needs, from one crew.
Each format has a different lead time and a different dominant cost. This is roughly how they differ.
Staging, lectern, screen and speech reinforcement in a hotel ballroom. Mostly hired inventory, so it moves fast.
Themed set dressing, table lighting, sound for a band and a run of show cued to the awards sequence.
Custom fabrication, LED and a reveal mechanic. Most of that time is fabrication, not on-site build.
Generator power, ground support rigging, dust and wind planning, and freight to a site with no permanent infrastructure.
Crew, transport and fabrication cost meaningfully less here than in Western Europe, which is usually what makes a scenographic set possible on a budget that would otherwise buy a hired backdrop. The saving is real, but it is not free: specialist kit that has to be freighted in eats part of it, so we are explicit about which half of the build is local and which is imported.
The other argument is the rooms themselves. A Palmeraie estate, a courtyard riad or a camp under the stars gives a production designer something to work with that a conference hotel simply cannot, forty-five minutes from the city.
Anything not covered here, ask the ops desk directly on WhatsApp.
Yes. Most standard staging, lighting and sound inventory is available in Casablanca or Marrakech. Anything specialist — a particular console, an unusual LED pitch, kinetic rigging — comes in from Europe, which adds freight and customs time. We flag that at quote stage rather than discovering it in build week.
Yes, and those are the builds worth doing well. Both have real constraints: a medina riad has no vehicle access, so everything is carried in by hand through the souk, and a desert camp needs generator power, dust management and a wind plan. Both are routine for us; both change the timeline and the budget.
A straightforward hotel ballroom build wants three to four weeks. A custom scenographic build with a fabricated set, LED and rigging wants eight to twelve, most of which is fabrication rather than on-site work. Short-notice builds are possible but narrow what can be made rather than hired.
Every outdoor build is quoted with a wind threshold and a named wet-weather alternative. Rigging comes down at a defined wind speed — that is a safety decision, not a judgement call on the night — so the alternative venue or cover is contracted in advance, not improvised.
Crew chiefs and production managers work in English and French. Floor crew work in Arabic and French, with the crew chief relaying. If your own technical director is coming, they brief the crew chief and it carries down cleanly.
Often. Plenty of European agencies bring their own creative and technical direction and need local execution: crew, kit, permits, power, freight and the people who know which supplier actually delivers. We are comfortable being the local half of that and staying invisible.
Venue, date, audience size and what the room has to do. A sketch or a reference image is worth more than a paragraph.
Trade only. A costed programme back within 24 hours.